Output |
Activity |
Tasks |
Implementation |
Inputs |
Timing |
Notes |
| Caspian Regional Thematic Centre for
Integrated Transboundary Coastal Area Management Planning |
Act. IB.1-3 Establishment
and operation of the ITCAMP-CRTC . Contribute to the region-wide initiatives of the CEP |
Establish ITCAMP Centre in
I.R.Iran including identification of personnel, setting up office, provision of equipment |
Govt, Director Consultant,
UNDP/PCU, |
Admin Equipment |
Jun 1999 |
Completed |
| Establish Caspian ITCAMP
Working Group comprised of contact points nominated by the Governments |
All Govts, Director |
Admin |
Jun 1999 |
Completed |
| Establish ITCAMP National
Networks through the ITCAMP Contact Point for each country |
NFPs, CPs, Director |
Admin Equipment |
Jun 1999 |
Completed |
| Create a functioning
communication and information exchange system linking the CRTC with the 4 Contact Points,
the Consultant, the PCU and the Iranian NFP and ISCF |
PCU, CRTC, CPs |
Admin Equipment |
Jun-Jul 1999 |
Partially completed |
Provide
close linkages to the TDA activities by collating and contributing data and information on
ITCAMP |
Director, CRTC, Data &
Info CRTC |
Admin |
Through-
out |
Continuing activity |
Coordinate
ITCAMP input to the NSAPs and SAP by identifying regional and common issues |
Director, CRTC, PCU |
Admin |
Through-
out |
Continuing activity |
Establish
and maintain close cooperation with other CRTCs and in particular, with Water Level
Fluctuation CRTC to address immediate threats to health, safety and the environment posed
by sea level fluctuations |
Director, CRTC, all other
CRTCs |
Admin |
Through-
out |
Continuing activity |
Act as a
regional focal point for all ITCAMP and related activities within the CEP |
Director, CRTC |
Admin |
Through
-out |
Continuing activity |
| A series of national Coastal
Profiles, a regional Overview of Coastal Planning and Management in the Caspian Region and
an ITCAMP Training Course in each participating country |
Act. VC.1 Assessment of the
ITCAMP situation in each participating country leading to a regional overview |
Develop a draft structure and
contents for the Coastal Profiles and adopt after taking into account country comments |
Director, Consultant, CPs |
Workshop |
Aug/Sep 1999 |
Completed |
First
Meeting of the ITCAMP Working Group to discuss : Draft Work Plan, Coastal Profiles,
Reviews of national coastal legislation and planning procedures; possibility of pilot
projects |
Director, CRTC, CPs,
Consultant |
Workshop |
Oct 1999 |
Completed |
Review National Reports
produced for TDA Framework; liaise with other CRTCs and rationalize any overlap and/or
duplication |
Consultant, Director |
Mission and homebased |
Jun-Jul 2000 |
Delayed pre-requisite for Coastal
Profiles |
Liaise with other CRTCs as
appropriate and access, obtain and review existing data sets, evaluate comprehensiveness
and reliability of data, identify gaps in essential information and undertake necessary
field work for essential new data to remedy gaps |
CPs, NPPPs, Data & Info CRTC, other
CRTCs |
Director; Country sub-contracts |
Jul-Aug
2000 |
Delayed must precede Coastal Profiles |
Compilation of the Coastal
Profile: review national legislation for coastal area planning, management, and resource
use; evaluate national responsibilities for ITCAMP at the national, provincial, and
municipal levels; collate with other descriptive data and information, and maps, etc |
CPs, NPPPs, Data & Info CRTC |
Country sub-contract |
Aug-Oct
2000 |
Delayed. To be preceded by review of Natl
Reports & discussion with other CRTC |
Based on the 5 National
Coastal Profiles, and the preparation of coastal maps, produce a Caspian Regional
Coastal Profile comprising an identification of regional issues, institutional
strengths and weaknesses, capabilities, training needs and training opportunities for the
Caspian Region |
Consultant, Director |
Admin Publication |
Oct
2000 |
Home-based communicate electronically |
Organize and deliver a basic
training course in ITCAMP principles and procedures, as well as the technical,
institutional and other ingredients required for effective coastal planning, in each of
the participating countries |
Director, Consultant, IOC |
Admin |
Oct-Dec
2000 |
Requires firm scheduling logistics and
organization |
| Draft Guidelines for the ITCAMP
Process, tested and evaluated in the field through pilot-scale trials |
Act. VC.2 Development of
Guidelines for ITCAMP and Field evaluation of draft Guidelines through Pilot Projects
|
Develop draft Guidelines for
Integrated Coastal Area Management Planning which will be broad enough to be applicable to
the circumstances of each of the participating countries as identified in the National
Coastal Profiles |
Consultant, Directror |
Admin |
Jan
2001 |
Home-based communicate electronically |
Develop selection criteria
for ITCAMP Pilot Projects, identify potential funding support, for ITCAMP Pilot Projects |
Director, CRTC, Consultant |
Admin |
Jan
2001 |
Home-based communicate electronically |
Second ITCAMP Working Group
Meeting to review the Regional Overview and its contribution to the TDA; review the draft
Guidelines for Integrated Coastal Area Management Planning; and identify the site in each
country for ITCAMP Pilot Projects |
Director, CRTC, Consultant, CPs |
Admin Mission
Workshop |
Feb
2001 |
|
Commence work on the Pilots
by establishing an interim Coastal Planning Office and Planning Team in each locality
where a Pilot Project is to be undertaken |
Govt, CPs, NPPPs |
Pilot Co-funding |
Mar
2001 |
Expected to be undertaken with
co-funding support primarily from Govts. Maybe only 1-2 pilots.
Consultants and Directors input from homebase electronically, however, may
require field mission |
| For each pilot site, determine the objectives
of the Coastal Area Management Plan within the Governments social, economic and
environmental policies |
Govt, CPs, NPPPs |
Pilot Co-funding |
Mar
2001 |
| Undertake socio-economic and ecological
surveys; assemble the results of database searches; obtain available maps and develop
required maps |
CPs, NPPPs, Director |
Pilot Co-funding |
Apr-Jul
2001 |
Identify the existing and
potential problems and opportunities for resource use, economic development, human
well-being and environmental protection within the selected area |
CPs, NPPPs, Director, Consultant |
Pilot Co-funding |
Apr-Jul
2001 |
Using the data and maps and
reflecting Central Government planning policies, produce a draft Coastal Management Plan
comprising overall policies and objectives, standards, limits, zones, sensitive coastal
areas, and other guidance for coastal managers |
NPPPs, Director, Consultant |
Pilot Co-funding |
Aug
2001 |
Publish the Draft Coastal
Management Plan and undertake a process of consultation with stakeholders through public
meetings, media campaigns, and other mechanisms, to obtain scientific, technical, NGO,
social, local government, industrial, public and any other views |
NPPPs, Director,
Consultant |
Pilot Co-funding
Publication |
Sep-Oct
2001 |
Taking into account the
input received, recalling the original objectives, and reflecting Government planning
policies, finalize the Coastal Management Plan and adopt it as the operational plan for
the pilot locality |
NPPPs, Director,
Consultant |
Pilot Co-funding |
Nov
2001 |
Evaluate each Pilot Project,
identifying strengths and weaknesses and noting how the Integrated Coastal Area Management
Planning Process can be improved to be more effective in the Caspian situation and reflect
the needs of Caspian countries |
CPs, Director, Consultant |
Admin Mission and
Homebased |
Dec 2001
-Jan 2002 |
Field mission to be followed by electronic
communications |
| Published Handbook for ITCAMP in the
Caspian environment |
Act. VC.3 Production of the
Handbook for ITCAMP |
Based on the Draft
Guidelines, produce a draft Handbook for Integrated Coastal Area Management Planning
for the Caspian Coast reflecting the Caspian Regional Coastal Profile and the
experience gained from the Pilot Projects |
Consultant, Director |
Admin |
Dec 2001
-Jan 2002 |
Home-based communicate electronically |
Third ITCAMP Working Group
Meeting to review the results of the Pilot Projects, adopt the draft Handbook and endorse
the material which is to be contributed to the SAP |
CRTC, Director, CPs, Consultant |
Workshop Admin
Mission |
Feb
2002 |
Final Workshop |
Final editing, translation,
layout and design, printing, publication and distribution of the Handbook for
Integrated Coastal Area Management Planning for the Caspian Coast |
Director, Consultant, Sub-Contractors |
Admin Publication |
Mar-Sep
2002 |
Home-based communicate electronically |
| Scope and prescription for Caspian
Atlas of Coastal Resources |
Plan for Caspian Atlas of Coastal
Resources |
In cooperation
with the PCU and other CRTCs, in particular the Data & Info CRTC, the Water
Fluctuation CRTC, Desertification CRTC and Emergency Response CRTC, develop the conceptual
and technical specifications for the Caspian Atlas of Coastal Resources, negotiate
for the necessary co-funding support for the publication of one or more volumes |
PCU, Consultant, Director, CPs, Data
& Info CRTC |
Admin Homebased |
Aug-Sep
2002 |
Home-based communicate
electronically |